Technical

The technical pages

Installation video and how to use the machine

Installation overview

Installation process overview

Material needed: ReverseTap unit, suitable cooler, beer KEG, Co2 & or with Co2 mixed Nitrogen

Preparation:

You need to make hole(s) in the table that matches the type of product you are installing

After positioning the cooler, beer KEG and Co2 in an appropriate position: connect the pipelines

Use cold insulators to enclose the connected pipelines. Installation is now complete

CONTACT US

Dilog Equipment AB

Magasinsgatan 35

434 37 Kungsbacka

Sweden

Tel: +46 300 568030

FOLLOW US

 

Twitter

Facebook

Instagram

© Copyright 2017. All Rights Reserved.